Welcome to Guangdong jin'ao Environmental Protection Technology Co., Ltd website!Main business:Waste gas treatment equipment
Guangdong jin'ao Environmental Protection Technology Co., Ltd
Guangdong jin'ao Environmental Protection Technology Co., LtdOne stop service provider for waste gas / wastewater environmental protection project
服务热线Service hotline:

0769-82222039
13794847008

Popular keywords: Industrial wastewater treatment   Waste gas treatment equipment

Basic requirements for purification works

source:Guangdong jin'ao Environmental Protection Technology Co., Ltd      time:2022-03-22 16:54:47

1. The construction enterprise undertaking the clean workshop project shall have corresponding engineering construction experience and complete quality management system.

2. The construction of clean workshop shall be carried out according to the contents of design documents and contracts. When the design is modified, it shall be confirmed and signed by the original design unit and approved by the construction unit.

3. Before the construction of the clean workshop, the construction scheme and procedures shall be formulated according to the characteristics of specific engineering projects, so as to ensure the coordinated construction of various types of work, clear stages and clear handover, and ensure the overall construction quality and safe operation.

4. When the construction enterprise undertakes the detailed construction design of the design drawings of each discipline in the clean workshop project, it shall implement the relevant provisions of the national standard code for design of clean workshop gb50073, strengthen the design quality management, and have a quality management system. The detailed construction drawings shall be approved or confirmed in writing by the original design unit and approved by the construction unit before construction.

5. The concealed works of each discipline in the clean workshop project must be accepted and approved by the owner or the supervisor before concealment.

6. The system commissioning for the completion acceptance of the clean workshop project shall be carried out with the joint participation of the construction unit and the supervision unit. The construction enterprise shall be responsible for the system commissioning and testing. The unit undertaking the commissioning shall have full-time technicians for commissioning and testing and test instruments complying with the provisions of this specification.



Contact
Tel:13794847008
Contacts:Miss Ouyang
Add: No. 10, block B, nanhheyuan, Songxi Road, Liaobu Town, Dongguan City
Scan QR code
Enter mobile website
copyright © 2022 Guangdong jin'ao Environmental Protection Technology Co., Ltd
Record No: 粤ICP备2022050133号